A Bradford company - serving Orange County, CA
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood

Blanco Home Additions & ADU Nationwide

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Orange County
A remodeled kitchen with a waterfall island and wood cabinets
An open kitchen and dining area after a remodel
A galley kitchen opened up to the dining room with a new peninsula
A stone counter, tile backsplash and open shelf after a kitchen remodel
New painted shaker cabinets with an organized deep drawer
A single-story rear room addition with tall windows and a new patio
A freestanding soaking tub in a remodeled primary bathroom
A whole-home remodel with the living, dining and kitchen areas opened up
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as$199/month*On approved credit; ask for current terms
Get your free estimate

Blanco Home Additions & ADU: The Orange County Owner’s Guide

Blanco home additions and ADU construction in Orange County typically runs $45,000 – $130,000 for a full addition, while a complete ADU build lands between $90,000 and $220,000 depending on square footage, site access, and foundation type. We install Blanco-compatible additions and ADUs with a written price before any work starts, and we stock the structural hardware and rough-in materials needed to keep the job moving. Most homeowners call us after realizing their current space can’t keep up, or after a previous contractor left them with a half-finished shell and a stack of change orders.

Call (562) 262-2907

Here’s what we see on nearly every walk: the homeowner wants more room, but the existing floor plan fights back. Maybe the kitchen island crowds the traffic lane, maybe the garage is dead space, maybe a second unit makes financial sense but the setback requirements are confusing. A Blanco addition or ADU isn’t a cabinet swap. It’s a foundation-to-roof build, and the part that fails first is almost always the planning – the missed permit, the undersized beam, the plumbing rough-in that doesn’t line up with the fixture set. That’s why Bradford Remodeling puts the full scope in writing before the first tool comes out.

Key Takeaways:

  • Installed pricing for Orange County additions: $45,000 – $130,000; ADUs: $90,000 – $220,000
  • Written line-item price before work begins – no numbers that move at the door
  • Permits pulled, inspections passed, and a signed written guarantee in your hand at job close
  • Live person answers the phone 24/7 at (562) 262-2907

Which Blanco Models This Applies To

A small remodeled galley kitchen with cabinets to the ceiling

Blanco’s home addition and ADU product line isn’t a single model – it’s a system of engineered wall panels, roof trusses, and connection hardware that varies by series. The current Blanco series includes the A-Series (attached single-story), the D-Series (detached accessory dwelling), and the G-Series (garage conversion kits). Each series has different load ratings for roof spans, different anchor patterns for seismic requirements, and different rough-in layouts for plumbing and electrical.

The compatibility gotcha we run into most: the Blanco D-Series ADU kit uses a proprietary anchor bolt pattern that does not match standard Simpson Strong-Tie templates. If you’re swapping or extending a Blanco ADU, you need the Blanco-matched plate set or a code-approved fabricated equivalent. We keep both on hand. The second checkable detail is the wall panel thickness – Blanco A-Series panels are 2×6 at 16-inch centers for attached units, while the G-Series garage kits use 2×4 at 24-inch centers, which changes insulation depth and electrical rough-in clearances. A homeowner swapping components between series will hit a wall, literally, on the first framing inspection.

OEM versus aftermarket here is straightforward: Blanco wall panels and connector hardware should stay OEM or come from a manufacturer with matching structural engineering. Aftermarket equivalents for interior finishes – drywall, LVP, fixtures – are fine and usually what we spec, because the Blanco price on those items carries a brand premium without a performance difference. Bradford Remodeling is an independent service provider and not affiliated with Blanco, but we install their systems by the book and to Orange County code.

  • How to identify your series: Look for the stamped metal tag on the bottom track of any Blanco wall panel or the hinge-side jamb of any Blanco door. The series letter is the first character of the part number.
  • What we stock on the truck: Blanco-matched anchor bolt sets, A-Series and D-Series connector plates, 2×6 and 2×4 structural-grade studs, hold-down brackets, and the full rough-in set for kitchen additions – supply lines, drain fittings, and box spacing.
Explore

Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Signs Your Blanco Home Additions & ADU Is Failing

  • Cracks running diagonally from window or door corners. This usually means settling or a foundation issue, not a cosmetic drywall crack. In Orange County we see it on hillside pads where drainage wasn’t addressed, and the soil expands and contracts through the seasons.
  • Doors that stick in summer and swing free in winter. That’s movement in the framing or the header above the door. Older Blanco A-Series additions with undersized headers over wide openings will sag over time, and the door gap tells you where.
  • Uneven floors or a visible bounce when someone walks across the room. This points to a joist span issue or a failing pier. On raised foundations in older Orange County neighborhoods, it’s common for the original crawlspace piers to be out of level.
  • Drywall seams or tape lines showing through paint. The structure is moving more than the drywall can absorb. If you can run a level across the ceiling and find more than a quarter inch of variance, that’s a framing problem, not a paint problem.
  • Water stains at the wall-to-roof connection on an ADU. That’s a flashing or roof-penetration failure where the Blanco D-Series roof assembly ties into the main dwelling. Left alone, the sheathing rots and the fix triples in cost.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Replacement Cost & What’s Included

A walk-in pantry with wood shelving

In Orange County, the full addition range is $45,000 to $130,000, and an ADU build runs $90,000 to $220,000. What drives the spread: square footage first, foundation type second (slab is cheaper than a stem wall or a hillside caisson job), and site access third. An ADU dropped behind a single-story Anaheim Hills home with a 40-foot driveway is a different job than a detached unit on a tight Balboa Island lot where every board gets walked in by hand.

Every Bradford Remodeling project includes the written line-item price, the permit set (we pull the permits), the inspection schedule, and the 365-Day Done Right Promise – a full-year written guarantee. If the work fails inside that window, we come back and correct it at no charge. Straight number, clear scope, no surprises at final invoice. Curtis Lane has been running crews across Orange County for well over a decade, and the final invoice on his jobs matches the first page he handed you.

Orange County installed pricing for Blanco-compatible projects
Project Type Typical Range
Attached Home Addition (A-Series) $45,000 – $130,000
Detached ADU Construction (D-Series) $90,000 – $220,000
Garage Conversion (G-Series) $30,000 – $80,000

DIY or Call Us?

You can check a few things safely: look for the metal series tag on the Blanco wall panel or door jamb, check for water stains at the roof-wall connection, and run a level across your ceiling or floor. That’s worth ten minutes. But framing, foundation work, and structural headers on an addition or ADU are not DIY territory. In Orange County, any structural change requires a permit, and the inspection will ask for engineering you can’t improvise.

What we fix most from homeowner attempts is the half-done version: a wall opened up, a beam exposed, and then a stop because the engineering didn’t work. It costs more to un-do than to do it right the first time. If you’re in Orange County and you want the number, call (562) 262-2907. A real person answers.

FAQs

Installers leveling a new base cabinet during a kitchen remodel

Getting started with Bradford in Orange County

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a kitchen with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A remodeling crew arriving at a home with lumber and tools

Your Orange County team

A local crew that works across Orange County and the towns around it, to the same written standard as every Bradford location.

Areas we serve
A worker laying floor protection and a dust barrier before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Orange County? Licensed & insured · Written quotes before work starts response · free estimates
Call (562) 262-2907
Local Service Coverage

Request a Free Estimate in Orange County

Tell us what you need - Bradford Remodeling Co Orange County responds fast. No obligation.

By submitting this form, you agree to our Privacy Policy and agree that you may be contacted by phone, text, or email regarding your service needs, including from the affiliated professionals who may take on the job.

Prefer to text? Text Now
Call Now - 24/7 Dispatch